Purpose of Notice

The California Department of General Services (DGS) is the lead agency responsible for preparation of an Environmental Impact Report (EIR) for the proposed 1215 O Street Office Building Project (proposed project), located in downtown Sacramento.

Pursuant to provisions of the California Environmental Quality Act (CEQA), DGS has prepared a Notice of Preparation (NOP) for the proposed project. Once a decision is made to prepare an EIR, the lead agency must prepare a NOP to inform all responsible and trustee agencies (agencies) that an EIR will be prepared (CEQA Guidelines Section 15082). The purpose of the NOP is to provide agencies, interested parties, and organizations with sufficient information describing the proposed project and the potential environmental effects to enable meaningful input related to the scope and content of information to be included in the EIR.

Notice of Completion of Final EIR, EIR Certification, and Project Approval

1215 O Street Office Building Project


The Draft EIR for the 1215 O Street Office Building Project was provided for public review from April 18 to June 2, 2017. The Department of General Services (Department) has now completed the Final EIR for the project. The Final EIR consists of a list of persons and agencies commenting on the Draft EIR, the comments received on the Draft EIR, responses to the comments, and revisions to the Draft EIR. The Final EIR is available for download below.

The Final EIR was presented to the decision-making body of the Department who reviewed and considered the information contained in the Final EIR, the Draft EIR, and the supporting documents. In accordance with Section 15090 of the California Environmental Quality Act (CEQA) Guidelines, the Department has certified that the Final EIR for the 1215 O Street Office Building Project has been completed in compliance with CEQA and reflects the Department’s independent judgement and analysis. The certification document is available for download below.

The Department has reviewed and approved the Findings and the Statement of Overriding Considerations for the project. The Findings and the Statement of Overriding Considerations are available for download below.

In accordance with Section 21081.6 of CEQA, the Mitigation Monitoring Plan for the 1215 0 Street Office Building Project has been approved and adopted. The MMRP is available for download below.

Upon consideration of the Final EIR, the Environmental Findings, and the Statement of Overriding Considerations, and in accordance with Section 15092 of the CEQA Guidelines, the Department approved the 1215 Office Building Project, the proposed project evaluated in the EIR. The project approval document is available for download below.

A Notice of Determination (NOD) has been prepared in accordance with Section 15094 of the CEQA Guidelines. The Department staff have filed the NOD with the State Clearinghouse. A copy of the NOD is available for download below.

    File Downloads

    • Final EIR for the 1215 O Street Office Building Project

      July 21, 2017
    • Findings and the Statement of Overriding Considerations

      July 21, 2017
    • Mitigation Monitoring Plan

      July 21, 2017
    • Project Approval Document

      July 21, 2017
    • Notice of Determination (NOD)

      July 21, 2017
    • EIR Certification Document

      July 21, 2017
    • Manadatory RFQ Meeting for SPIF Program O Street and P Street Sign in Sheet

      April 27, 2017
    • Mandatory RFQ Meeting for SPIF Program_O Street and P Street Presentation Slides

      April 27, 2017
    • Notice of Preparation

      December 14, 2016
    • Notice of Availability of the Draft Environmental Impact Report

      April 18, 2017
    • Cover O Street Draft EIR

      April 18, 2017
    • TOC O Street Draft EIR

      April 18, 2017
    • 01 O St Introduction DEIR

      April 18, 2017
    • 02 O St Exec Summary DEIR

      April 18, 2017
    • 03 O St Proj Descrip DEIR

      April 18, 2017
    • 04 4.1 O St Env Intro DEIR

      April 18, 2017
    • 04 4.2 O St Land Use DEIR

      April 18, 2017
    • 04 4.3 O St Pop Emp Hsng DEIR

      April 18, 2017
    • 04 4.4 O St Transportation DEIR

      April 18, 2017
    • 04 4.5 O St Utilities Infrastr DEIR

      April 18, 2017
    • 04 4.6 O St Air Quality DEIR

      April 18, 2017
    • 04 4.7 O St GHG DEIR

      April 18, 2017
    • 04 4.8 O St Noise DEIR

      April 18, 2017
    • 04 4.9 O St Geo Soils EIR

      April 18, 2017
    • 04.10 O St Hydro WQ DEIR

      April 18, 2017
    • 04.11 O St Hazards DEIR

      April 18, 2017
    • 04.12 O St Cultural DEIR

      April 18, 2017
    • 04.13 O St Bio Resources DEIR

      April 18, 2017
    • 04.14 O St PublicSvcs DEIR

      April 18, 2017
    • 04.15 O St Visual Res DEIR

      April 18, 2017
    • 05 O St Cumulative DEIR

      April 18, 2017
    • 06 O St Other CEQA DEIR

      April 18, 2017
    • 07 O St Alternatives DEIR

      April 18, 2017
    • 08 O St References DEIR

      April 18, 2017
    • 09 O St Rpt Preparers DEIR

      April 18, 2017
    • Apdx A NOP_Cmmts

      April 18, 2017
    • Apdx B Traffic Data

      April 18, 2017
    • Apdx C Mobile Enrgy Calcs

      April 18, 2017
    • Apdx D AQ Modeling Data

      April 18, 2017
    • Apdx E GHG Modeling Data

      April 18, 2017
    • Apdx F Noise Modeling Data

      April 18, 2017
    • Apdx G Geo Rpt

      April 18, 2017
    • Apdx H O St Phs I ESA

      April 18, 2017
    • Apdx I Bio Data

      April 18, 2017
    • Apdx J Visual Sims

      April 18, 2017
    • Apdx K LEED v4 BDC Adda

      April 18, 2017
    • O Street Office Building DEIR 04.18.17

      April 18, 2017